Questions before a purchase
Where is the workshop, and how can an overseas buyer see a machine?
The office is Room 306, Office Building, No. 94 Wanhong Avenue, Luojiang District, Quanzhou. Overseas buyers usually start by sending a sample and the target pack to Robin Li; we reply with a trial video and a waste log. A plant visit is by appointment and only on a day when a trial is already planned.
Do you train operators?
Yes, in two parts: changeovers and safe stops in Quanzhou before shipment, then start-up at the buyer's plant after the machine arrives. Visas, lodging and time zones sit in the export-contract appendix. Training does not cover a buyer-owned bagger unless its maker signed the interface drawing.
How is an export lead time estimated?
A standard build follows the current production schedule, plus export packing and the destination-port conditions. A waist change, a vision option or a bagger SolidWin does not supply restarts the clock. This website does not promise a number of weeks.
Can the waist be changed to match our sample?
We can evaluate it. Send a finished product and the waist material, not only artwork. The result may be new guides and a recipe, or a recommendation to switch platforms. Either result changes price and lead time.
What does the warranty cover?
The demonstration default is 12 months from signed acceptance, covering manufacturing defects in non-wearing parts. Knives, heater strips and belts are excluded. A real project follows its contract, and this paragraph can be rewritten in the admin.
How are spare parts supplied?
Spares are three booklets: start-up, annual wear and long-lead items. On an export project they can ship with the machine or to an agreed overseas locker. Start-up parts must be at the buyer's plant before acceptance begins. Long-lead rolls have their drawing revision frozen at signing.
